New software does not automatically make an architecture or engineering practice more productive. A new tool might speed up one task while creating extra work elsewhere. A model might contain the right information but still cause problems when another consultant receives it. And an AI tool might produce a useful first draft that takes longer to correct than to write from scratch.
These are the kinds of practical issues worth considering when reading Autodesk’s 2027 State of Design & Make report.
Explore Autodesk’s 2027 State of Design & Make
Discover the global research behind the trends shaping the architecture, engineering, and construction industries.
Download the Autodesk Report →DESIGN & MAKE
The report examines how organisations across the design and make industries are approaching digital transformation, artificial intelligence (AI), sustainability, and collaboration. Based on responses from 5,500 leaders and experts across 23 countries, it offers a broad view of the changes affecting these industries. AEC professionals accounted for 37% of respondents.
For architecture, engineering, and construction (AEC) companies in Australia and New Zealand, the question is what these findings mean for everyday project work. Smaller practices face particular constraints: tight deadlines, limited training time, software costs, and a reliance on a few people who understand how critical workflows operate.
At Interscale, we see five areas worth paying attention to: how firms measure technology investments, manage project information, introduce AI, train their teams, and prepare design data for carbon assessments.
1. Measure Digital Investment Against Project Delivery
Buying software is easy to measure. Working out whether it has improved project delivery is harder.
For an AEC practice, the useful question is how much effort it takes to produce work that meets the required standard. That includes preparation, checking, corrections, and the time spent dealing with problems.
Consider a drawing issue that takes 120 minutes to prepare and check. A revised workflow reduces that time to 80 minutes, saving 40 minutes per issue.
If the firm handles 15 comparable issues, it recovers 10 hours. If setup and training also take 10 hours, the initial time investment has been recovered after those 15 issues, assuming the savings hold.
That is a useful starting point, but it is not the whole business case. Software fees, ongoing support, and additional corrections can reduce the benefit. The recovered time also needs to be put to productive use before it translates into a financial return.
The distinction matters for firms working on fixed-fee projects. If a team can complete the agreed scope with fewer hours, it may protect its project margin. But a faster process is only valuable if the quality of the deliverable remains acceptable.
Where to start
Before investing in a new tool, establish what needs improving and how you will measure the result.
Identify the task
Identify a repetitive task that takes a measurable amount of time.
Establish a baseline
Record the current time spent on preparation, checking, and corrections.
Test the change
Test the proposed change on comparable work.
Calculate the full cost
Include setup, training, software, and support costs in the calculation.
Keep the comparison simple. Measure the total effort required to deliver work that meets the same requirements.
Before investing in another tool, find out where the time actually goes. A problem caused by missing project information needs a different solution from one caused by repetitive formatting.
2. Give Project Data an Owner and a Clear Handover
A model can be technically correct and still be unsuitable for the person receiving it.
This often becomes apparent when project information moves between consultants. An architectural model issued for structural coordination, for example, might contain the information needed to check levels and openings but lack the detail required for fabrication.
If the intended use and limitations are not clear, the receiving team has to work out what it can rely on. That creates room for misunderstandings, repeated checks, and unnecessary coordination work.
A good handover starts before the model is issued. The project team needs to agree on the information required at each milestone and document what the recipient should expect.
The release record should identify the model’s purpose, authorised revision, coordinates, units, and agreed file format. If the project requires IFC, the relevant version and export settings should also be recorded.
Someone should be responsible for checking the release. That means testing the file in the receiving team’s normal software, confirming that the model is aligned correctly, and making sure the required information is available.
NATSPEC’s Exchange Information Requirements guidance and the New Zealand BIM Handbook’s Model Description Document offer useful reference points for defining information requirements and explaining what a model contains.
Where to start
Make sure every model handover has clear requirements, defined responsibilities, and information the receiving team can use.
Define information requirements
Agree on information requirements before each project milestone.
Assign responsibility
Assign responsibility for checking and releasing models.
Document the handover
Document revisions, intended uses, and known limitations.
Test the exchange
Test the exchange before treating the handover as complete.
A successful handover goes beyond file delivery. Confirm that the receiving team can access and use the model for its intended purpose.
The aim is straightforward: the next consultant should be able to use the information for its agreed purpose without having to guess what the sender intended.
3. Test AI on One Defined Task with Human Review
AI is attracting investment across the design and make industries. Autodesk’s report found that 75% of respondents plan to increase AI investment over the next three years, while 40% said they were approaching or had achieved their AI goals.
Those figures describe different aspects of adoption. They do not, on their own, show whether AI is saving time or improving project outcomes.
For a smaller AEC firm, a limited trial is a sensible way to find out.
Take meeting minutes from a coordination meeting. An AI tool could use approved notes to draft a list of actions, assigned owners, and deadlines. The reviewer can compare each item with the original notes and check whether the summary accurately reflects what was agreed.
The risks are easy to overlook. A tool might turn an unresolved discussion into a decision or assign a deadline that nobody agreed to. If the summary is then circulated to the project team, that mistake could affect subsequent work.
Project information also needs to be handled carefully. Before uploading notes, drawings, or other project material, check whether the tool is approved for that use and understand its data access, retention, and reuse terms.
The trial should measure the time spent on the entire task, not just the time taken to generate the first draft. Prompting, reviewing, correcting, and preparing the final output all count.
Where to start
Start with one defined AI use case and measure whether it improves the work without compromising accuracy or project information.
Choose one task
Choose one task with a clear, verifiable output.
Set usage boundaries
Agree on the tools and project information that can be used.
Verify the output
Have a responsible person check the output against its source.
Measure the results
Record mistakes, corrections, and total time spent.
Decide whether to expand
Expand the trial only if the results justify it.
Measure the whole task, not just AI output. Include prompting, review, and corrections when comparing the trial with your existing workflow.
AI does not need to make every task faster to be useful. But the firm should know where it helps, where it falls short, and how much checking its output requires.
4. Make Training Part of the Project Programme
In a small practice, a workflow can depend heavily on one person’s knowledge.
That person might maintain the Revit template, know which export settings to use, or understand how to fix a problem that the rest of the team rarely encounters. The instructions may exist, but they might not cover the decisions needed when something goes wrong.
This creates a practical problem when that person is unavailable or someone else has to take over the work.
Training can help, but it needs to reflect how the firm actually delivers projects. A general software session may improve familiarity with a tool without teaching someone how to complete a specific deliverable independently.
A more useful exercise is to train against an upcoming task. Give another practitioner a copy of the model, the approved sheet list, and the relevant instructions. Ask them to complete the drawing issue without relying on the original creator for step-by-step help.
The result will show whether the instructions are sufficient and which parts of the process still depend on undocumented knowledge.
This approach also gives the firm something concrete to improve. Instead of scheduling training simply because a new feature is available, the team can address the gaps that have affected actual project work.
Where to start
Make project workflows easier to repeat by documenting key decisions and giving other team members practical experience.
Identify knowledge gaps
Identify tasks that only one person can complete confidently.
Document key decisions
Document the settings and decisions involved.
Train around real work
Schedule practice around a real project deliverable.
Test independent delivery
Ask another team member to repeat the process independently.
Improve the instructions
Update the instructions based on the problems they encounter.
Training should reduce reliance on individual knowledge. Check whether another team member can complete the task to the required standard without step-by-step help.
For sole practitioners, the same principle applies even without an internal team. Documenting a repeatable process makes it easier to return to the task later or hand it to an external collaborator.
5. Prepare Design Data for the Carbon Assessment Required
Design models can provide useful information for sustainability assessments, but the quantities they contain are not necessarily sufficient for the assessment a project needs.
The requirements depend on the assessment method, its boundaries, and the evidence needed to support the results.
In Australia, NABERS Embodied Carbon assesses upfront emissions associated with materials production through construction, covering life-cycle stages A1–A5. Its v2.1 rules require a Bill of Quantities and as-built evidence for key materials. A quantity schedule generated from a design model alone cannot establish everything needed for an accredited rating.
New Zealand’s BRANZ LCAQuick serves a different purpose. It supports whole-building life-cycle assessment and the comparison of design options, including embodied and operational impacts.
These approaches illustrate why project teams should establish the assessment requirements before preparing information for handover.
Consider a concrete schedule reporting 120 m³. The figure is more useful when the assessor can identify the source model revision, material specification, and elements included in the quantity. The team also needs to check units, missing information, and possible duplication across linked models.
If the design changes, the associated information may need to be updated as well.
These details can be difficult to reconstruct once a project has progressed, particularly when quantities have been exported from different models or revised by several parties.
Where to start
Prepare design information that meets the requirements of the carbon assessment, including the quantities and supporting evidence.
Confirm assessment requirements
Confirm the assessment method and its information requirements.
Agree on quantities and evidence
Agree on the quantities and supporting evidence that need to be supplied.
Document the source data
Record the source revision, material specification, and included elements.
Check linked models
Check linked models for missing or duplicated quantities.
Keep records up to date
Keep the records aligned with design and specification changes.
A quantity is only useful when its source is clear. Make sure the assessor can identify what the figures represent and trace them back to the relevant design information.
The earlier these requirements are understood, the easier it is to prepare useful information without having to reconstruct the evidence later.
What Should Your Firm Tackle First?
The five lessons point to different areas of practice, but they do not all need attention at once. Start with a recurring problem that is already affecting project delivery. It might be time lost correcting drawing issues, confusion over model revisions, or a workflow that only one person knows how to complete.
A simple 30-day trial can help establish whether a change is worth pursuing.
Improvement Plan.
Follow four practical steps to test a workflow improvement and decide whether it is worth continuing.
Record the current process
Choose the task, define the expected output, and measure the time spent preparing, checking, and correcting the work.
Set up the trial
Assign an owner and reviewer, confirm the requirements, and agree on the time and resources available.
Test the change
Apply the revised process to comparable work and record the time, errors, corrections, and assistance required.
Review the results
Compare the output and total effort with the original process. Decide whether to continue, revise, or stop.
Make the decision based on evidence. Compare quality and total effort against the original process before committing to a wider rollout.
The purpose is to make the decision based on actual project work rather than assumptions about what a tool or new process should deliver.
Turning the Findings into Better AEC Workflows
Autodesk’s 2027 State of Design & Make report provides a broad view of the issues shaping the design and make industries.
For AEC firms, the practical questions are more specific: Is the technology worth the investment? Can the next consultant use the information provided? Does AI reduce the work involved? Can another team member repeat the process? Is the design data sufficient for the required assessment?
Those questions are worth answering before committing to a larger technology investment. For some firms, the first improvement may be a clearer model handover. For others, it may be better Revit training, a more reliable template, or a controlled trial of an AI tool.
Need help with your BIM workflows or technology decisions?
Interscale works with AEC firms across Australia to improve coordination processes, provide software training, and support the IT systems their teams rely on.
If a particular workflow is causing delays or repeated corrections, bring a recent deliverable and the requirements behind it. We can discuss the problem and identify a practical next step.