{"id":3899,"date":"2024-05-20T13:00:00","date_gmt":"2024-05-20T03:00:00","guid":{"rendered":"https:\/\/blog.interscale.com.au\/?p=3899"},"modified":"2025-10-10T00:27:11","modified_gmt":"2025-10-09T13:27:11","slug":"the-bim-lifecycle","status":"publish","type":"post","link":"https:\/\/interscale.com.au\/blog\/the-bim-lifecycle\/","title":{"rendered":"The BIM Lifecycle: A Smarter Approach to Building from Start to Finish"},"content":{"rendered":"<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_84 ez-toc-wrap-left counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title\" style=\"cursor:inherit\">Table of Contents<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewBox=\"0 0 24 24\" version=\"1.2\" baseProfile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1 eztoc-toggle-hide-by-default' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/interscale.com.au\/blog\/the-bim-lifecycle\/#BIM_Lifecycle_Stages\" >BIM Lifecycle Stages<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/interscale.com.au\/blog\/the-bim-lifecycle\/#Conceptualization_and_Design\" >Conceptualization and Design<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/interscale.com.au\/blog\/the-bim-lifecycle\/#Pre-Construction_and_Planning\" >Pre-Construction and Planning<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/interscale.com.au\/blog\/the-bim-lifecycle\/#Construction_Phase\" >Construction Phase<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/interscale.com.au\/blog\/the-bim-lifecycle\/#Operations_and_Maintenance\" >Operations and Maintenance<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/interscale.com.au\/blog\/the-bim-lifecycle\/#Renovation_and_Demolition\" >Renovation and Demolition<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/interscale.com.au\/blog\/the-bim-lifecycle\/#Integrating_BIM_Across_the_Lifecycle\" >Integrating BIM Across the Lifecycle<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/interscale.com.au\/blog\/the-bim-lifecycle\/#How_Interscale_Can_Help_You_Make_the_Most_of_the_BIM_Lifecycle\" >How Interscale Can Help You Make the Most of the BIM Lifecycle<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/interscale.com.au\/blog\/the-bim-lifecycle\/#Conclusion\" >Conclusion<\/a><\/li><\/ul><\/nav><\/div>\n\n<p class=\"wp-block-paragraph\"><strong><strong><a href=\"https:\/\/interscale.com.au\/blog\/\">Interscale Content Hub<\/a><\/strong><\/strong>&nbsp;\u2013&nbsp;The BIM lifecycle is a structured approach for managing information, making it easier for everyone to work together and making decisions throughout the project.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">If you&#8217;re in the construction or architecture business, understanding the BIM lifecycle is key to making the most of this game-changing technology.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">And it&#8217;s important to know that each stage of this lifecycle offers efficiency, innovation, and better ways to work together.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">So, let&#8217;s go to the details of each stage. Time to buckle up.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"BIM_Lifecycle_Stages\"><\/span>BIM Lifecycle Stages<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The BIM lifecycle isn&#8217;t a set-in-stone, one-size-fits-all process. Instead, it&#8217;s a flexible and evolving framework that adapts to the various phases and unique demands of a construction project.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Because it&#8217;s always improving, what we learn in one phase of the BIM lifecycle can help us do things better in the next phase. And what we learn from one project can help us do things better in future projects.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For illustrations of how BIM is evolving, you can read<strong> &#8220;<span style=\"text-decoration: underline;\"><em><a href=\"https:\/\/interscale.com.au\/blog\/the-impacts-of-bim-on-cost-savings-in-large-scale-projects\/\">The Impact of BIM on Cost Savings in Large-Scale Projects: A Guideline<\/a><\/em><\/span>.&#8221;<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Now, let\u2019s break down every stage of BIM.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Conceptualization_and_Design\"><\/span>Conceptualization and Design<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">In the conceptualization and design stage, architects, engineers, and stakeholders work together to come up with the initial project concept.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">They use BIM tools to create a detailed 3D digital representation of the building, including data about materials, spatial relationships, and design elements.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This detailed model helps stakeholders see what the finished product will look like, which makes it easier for them to make informed decisions.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">We look at all the different design options and make sure they look good, work well, and meet all the rules.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For instance, parametric modeling lets you make quick changes to dimensions and layouts without losing any data.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Clash detection features help identify potential conflicts between building systems, which means less rework.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The BIM model also lets you do early energy simulations and cost estimates, so you can make sure your design is sustainable, cost-effective, and functional before moving on to the next project phase.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Pre-Construction_and_Planning\"><\/span>Pre-Construction and Planning<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Once the design is all set, the project moves on to the pre-construction and planning phase.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">At this stage, BIM tools are really useful for planning in detail, estimating costs, and scheduling.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A well-structured BIM model makes it easy to get accurate quantity takeoffs and cost analysis, which helps you get precise material and labor estimates.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Scheduling is made easier with 4D BIM, which puts the project timeline right alongside the 3D model. This lets teams see what&#8217;s going on at any given time.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Clash detection makes sure that different systems, like plumbing, electrical, and HVAC, don&#8217;t clash with each other, which means fewer changes on the job site.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">BIM also helps with procurement by linking the model to the supply chain, so materials can be delivered on time.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Plus, we come up with ways to spot and deal with potential problems, and we make sure the construction goes as smoothly as possible.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Construction_Phase\"><\/span>Construction Phase<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">In the construction phase, BIM is the central hub for all project data.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This means that contractors, subcontractors, and project managers can access up-to-date information to manage resources, track progress, and ensure that everything is done according to the design specifications.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">With accurate 3D models, you can prefabricate components like structural steel or MEP systems, which cuts down on on-site work and material waste.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The BIM model gets updated with real-time data collected on-site, like progress photos and quality assessments, to reflect the current as-built conditions.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This ongoing update process ensures any discrepancies between the design and the actual construction are quickly identified and fixed, which means a more accurate final model that makes it easier to hand over the project and manage it over time.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Operations_and_Maintenance\"><\/span>Operations and Maintenance<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Once the construction phase is over, the BIM model becomes a digital twin of the building.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This is a great resource for facility management because it&#8217;s accurate and comprehensive.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This digital twin has all the info you need about building components, systems, and assets, so facility managers can schedule maintenance, track warranties, and optimize energy consumption with ease.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For instance, managers can access maintenance schedules, generate work orders, and analyze equipment performance data using BIM-integrated software like IBM Maximo or Autodesk BIM 360 Ops.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Space optimization is made easier by being able to see how the building is being used, which helps managers make better decisions about how to use the space.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">BIM also gives you a detailed historical record of building modifications, which helps you make strategic decisions throughout the asset&#8217;s life cycle.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This approach helps cut operational costs, boosts occupant satisfaction, and extends the building&#8217;s lifespan.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Renovation_and_Demolition\"><\/span>Renovation and Demolition<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">As buildings get older or their uses change, it&#8217;s often necessary to renovate or demolish them.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The BIM model makes these processes easier by giving you all the info you need on existing structures and materials.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">BIM is great for testing renovation plans virtually, which helps you assess feasibility and reduce disruptions.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For instance,<strong> <\/strong><a href=\"https:\/\/graphisoft.com\/content\/uploads\/case-studies\/graphisoft-case-study-the-scenario-house-2019.pdf\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>Scenario Architecture used BIM<\/strong><\/a> in a renovation and extension project in London.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The partners bought a Victorian terraced house to completely renovate, expand, and adapt it to their own family&#8217;s needs.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Working on the director\u2019s own house was a great chance to really put ARCHICAD, Scenario\u2019s BIM tool of choice, through its paces and see just how effective BIM can be when it\u2019s used on a single residential renovation and expansion project.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">At the same time, BIM helps with sustainable demolition by identifying recyclable materials and reducing landfill waste.&nbsp;<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Integrating_BIM_Across_the_Lifecycle\"><\/span>Integrating BIM Across the Lifecycle<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">BIM manages and shares consistent and comprehensive information from the design phase through construction, operation, and eventual demolition.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">To make this happen, you need a well-structured approach that ensures all the data flows smoothly and everyone can work together.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A Common Data Environment (CDE) is a single platform where all the project stakeholders can access and share data.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">If you keep all the data in one place, you can avoid dealing with many different sources and ensure that everyone has access to the right information at the right time.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This framework makes it easier for stakeholders to share information and work together more effectively.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Xu and his colleagues published a paper called<strong> <\/strong><a href=\"https:\/\/www.researchgate.net\/publication\/276185096_A_Framework_for_BIM-Enabled_Life-Cycle_Information_Management_of_Construction_Project\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>&#8220;<em>A Framework for BIM-enabled Life-cycle Information Management of Construction Projects<\/em>.&#8221;<\/strong><\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">They came up with a BIM-enabled lifecycle information management framework that breaks the process down into three main phases:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>D-BIM (Design Phase)<\/li>\n\n\n\n<li>C-BIM (Construction Phase)<\/li>\n\n\n\n<li>O-BIM (Operation Phase).<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">When it comes to the design phase, a comprehensive 3D model, known as D-BIM, includes all the public info, design specs, and regulatory compliance data you could need.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This model should have features like collision detection and building performance analysis to make sure everyone&#8217;s on the same page.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For instance, lighting designers can quickly see how adding skylights will affect the space, and architects can optimize exterior louvers to minimize heat gain.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The design model is linked to scheduling info in the construction phase, forming C-BIM.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This lets project managers see how the construction is going in 4D. C-BIM combines data on construction safety monitoring, cost control, and quality assurance to give project managers a complete tool for managing construction logistics.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For example, an accurate 4D BIM model helped Skanska see how the different phases of the renovation of the New York City subway station would fit together, so they could ensure everything would be done on time and avoid any problems.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Once construction is done, the BIM model becomes O-BIM, a digital twin of the building. This helps facility managers with maintenance scheduling, energy management, and emergency planning.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The digital twin includes manuals and maintenance records for all the building&#8217;s equipment, giving you a historical overview of all the building&#8217;s components.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Finally, the BIM model should include material specs to support sustainable demolition practices and material recycling.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">If you make sure that the data from O-BIM is complete, it can help teams during renovation or demolition. It can also help them identify recyclable materials and minimize waste.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">It&#8217;s important to organize and define the necessary information components at each stage to ensure that information flows smoothly from one stage to the next.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">During the design phase, you&#8217;ll want to include public policies, similar project data, location information, survey data, and economic estimates.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In the construction phase, it&#8217;s important to have data like laws, project-specific details (like drawings and contracts), construction logs, and resource schedules.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The operation phase benefits from national and local policies, contract documents, project updates, and facility management information.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">And please note that it&#8217;s really important to ensure the information flows smoothly between the different stages.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Yup, it&#8217;s important to make sure that the design data, like drawings and specifications, gets transferred to the construction teams accurately so that they can execute the project properly.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Once the construction is finished, the facility managers get the as-built information and equipment manuals so they can run the place smoothly.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Finally, historical data helps renovation teams and demolition contractors make smart decisions.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">When you&#8217;re integrating everything, you also need to think about cybersecurity. So, kindly refer to <strong>&#8220;<span style=\"text-decoration: underline;\"><em><a href=\"https:\/\/interscale.com.au\/blog\/a-guide-to-proper-security-analytics-tools\/\">Outsmart Cyber Threats: A Guide to the Best Security Analytics Tools for You<\/a><\/em><\/span>.\u201d<\/strong><\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"How_Interscale_Can_Help_You_Make_the_Most_of_the_BIM_Lifecycle\"><\/span>How Interscale Can Help You Make the Most of the BIM Lifecycle<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">At Interscale, we know that BIM success depends on a tailored, lifecycle-wide approach. So, we offer custom BIM solutions to meet your specific project needs.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This could be anything from creating detailed 3D models to coordinating between teams with clash detection or streamlining future renovations with as-built data.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">We start by getting to know your specific challenges. And we&#8217;re confident that our solutions will help you overcome your specific challenges and make the most of BIM technology.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">With Interscale, your BIM model becomes a central hub for all your project info, giving your team a single source of truth.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This means better scheduling to avoid delays, more accurate budgeting, and improved communication, so projects stay on track.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">You can see our BIM lifecycle management expertise in our work with K2LD Architects, where we helped them improve CAD\/BIM standards and data consistency across multiple projects.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Think your company could benefit from a similar success story?<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Kindly take a moment to read our <strong><a href=\"https:\/\/interscale.com.au\/services\/bim-services\/\">Interscale BIM management service<\/a><\/strong> page. It\u2019ll give you a good idea of our approach and experience.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">If you&#8217;re ready to talk about your BIM needs and goals, we&#8217;d love to set up a consultation.<\/p>\n\n\n\n<div class=\"wp-block-buttons is-content-justification-center is-layout-flex wp-container-core-buttons-is-layout-3e41869c wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link has-white-color has-text-color has-background has-link-color wp-element-button\" href=\"https:\/\/interscale.com.au\/contact-us\/\" style=\"background-color:#fd8832\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>Transform Your Projects with Elite BIM Expertise<\/strong><\/a><\/div>\n<\/div>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Conclusion\"><\/span>Conclusion<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Knowing what BIM can do at each stage\u2014from design to maintenance\u2014can help you make smarter decisions and improve efficiency.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">With BIM, you can spot potential design issues early on, manage costs more effectively, and make sure the final building aligns with the project&#8217;s goals.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Even after the project is done, the BIM lifecycle can help with maintenance and potential renovations. So, why not give the BIM lifecycle a try?<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Interscale Content Hub&nbsp;\u2013&nbsp;The BIM lifecycle is a structured approach for managing information, making it easier for everyone to work together and making decisions throughout the project. If you&#8217;re in the construction or architecture business, understanding the BIM lifecycle is key to making the most of this game-changing technology. And it&#8217;s important to know that each [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":4136,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[871],"tags":[],"class_list":["post-3899","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-bim"],"acf":[],"_links":{"self":[{"href":"https:\/\/interscale.com.au\/blog\/wp-json\/wp\/v2\/posts\/3899","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/interscale.com.au\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/interscale.com.au\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/interscale.com.au\/blog\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/interscale.com.au\/blog\/wp-json\/wp\/v2\/comments?post=3899"}],"version-history":[{"count":0,"href":"https:\/\/interscale.com.au\/blog\/wp-json\/wp\/v2\/posts\/3899\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/interscale.com.au\/blog\/wp-json\/wp\/v2\/media\/4136"}],"wp:attachment":[{"href":"https:\/\/interscale.com.au\/blog\/wp-json\/wp\/v2\/media?parent=3899"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/interscale.com.au\/blog\/wp-json\/wp\/v2\/categories?post=3899"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/interscale.com.au\/blog\/wp-json\/wp\/v2\/tags?post=3899"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}