{"id":9555,"date":"2025-10-02T20:47:48","date_gmt":"2025-10-02T10:47:48","guid":{"rendered":"https:\/\/interscale.com.au\/blog\/?p=9555"},"modified":"2025-10-21T23:17:33","modified_gmt":"2025-10-21T12:17:33","slug":"construction-scheduling-software","status":"publish","type":"post","link":"https:\/\/interscale.com.au\/blog\/construction-scheduling-software\/","title":{"rendered":"Top 10 Construction Scheduling Software for Efficient Project Delivery"},"content":{"rendered":"<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_85 ez-toc-wrap-left counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title\" style=\"cursor:inherit\">Table of Contents<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewBox=\"0 0 24 24\" version=\"1.2\" baseProfile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1 eztoc-toggle-hide-by-default' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/interscale.com.au\/blog\/construction-scheduling-software\/#What_Is_Scheduling_in_Construction\" >What Is Scheduling in Construction?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/interscale.com.au\/blog\/construction-scheduling-software\/#Key_Features_to_Look_For\" >Key Features to Look For<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/interscale.com.au\/blog\/construction-scheduling-software\/#How_to_Set_Up_a_Construction_Schedule\" >How to Set Up a Construction Schedule?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/interscale.com.au\/blog\/construction-scheduling-software\/#Top_Construction_Scheduling_Software\" >Top Construction Scheduling Software<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/interscale.com.au\/blog\/construction-scheduling-software\/#1_Autodesk_Construction_Cloud_Best_for_Collaboration_Control\" >1. Autodesk Construction Cloud (Best for Collaboration &amp; Control)<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/interscale.com.au\/blog\/construction-scheduling-software\/#2_Procore_Best_for_Integrated_Project_Platform\" >2. Procore (Best for Integrated Project Platform)<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/interscale.com.au\/blog\/construction-scheduling-software\/#3_Buildertrend_Best_for_Residential_Builders\" >3. Buildertrend (Best for Residential Builders)<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/interscale.com.au\/blog\/construction-scheduling-software\/#4_Microsoft_Project_Best_for_Familiar_Gantt_Work\" >4. Microsoft Project (Best for Familiar Gantt Work)<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/interscale.com.au\/blog\/construction-scheduling-software\/#5_Primavera_P6_Best_for_Mega-Projects\" >5. Primavera P6 (Best for Mega-Projects)<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/interscale.com.au\/blog\/construction-scheduling-software\/#6_Smartsheet_Best_for_Spreadsheet_Lovers\" >6. Smartsheet (Best for Spreadsheet Lovers)<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-11\" href=\"https:\/\/interscale.com.au\/blog\/construction-scheduling-software\/#7_Jobber_Best_for_trade_service_teams\" >7. Jobber (Best for trade service teams)<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-12\" href=\"https:\/\/interscale.com.au\/blog\/construction-scheduling-software\/#8_Buildxact_Best_for_Small_Builders_Take-Offs\" >8. Buildxact (Best for Small Builders &amp; Take-Offs)<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-13\" href=\"https:\/\/interscale.com.au\/blog\/construction-scheduling-software\/#9_Fieldwire_Best_for_Site_Coordination\" >9. Fieldwire (Best for Site Coordination)<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-14\" href=\"https:\/\/interscale.com.au\/blog\/construction-scheduling-software\/#10_Connecteam_Best_for_Workforce_Shifts\" >10. Connecteam (Best for Workforce Shifts)<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-15\" href=\"https:\/\/interscale.com.au\/blog\/construction-scheduling-software\/#Our_Choice_for_Construction_Scheduling_Platforms\" >Our Choice for Construction Scheduling Platforms<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-16\" href=\"https:\/\/interscale.com.au\/blog\/construction-scheduling-software\/#Flexible_Licensing_for_Construction_Scheduling_Software\" >Flexible Licensing for Construction Scheduling Software<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-17\" href=\"https:\/\/interscale.com.au\/blog\/construction-scheduling-software\/#Key_Takeaways\" >Key Takeaways<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-18\" href=\"https:\/\/interscale.com.au\/blog\/construction-scheduling-software\/#FAQ\" >FAQ<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-19\" href=\"https:\/\/interscale.com.au\/blog\/construction-scheduling-software\/#What_is_the_Best_Project_Scheduling_Tool\" >What is the Best Project Scheduling Tool?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-20\" href=\"https:\/\/interscale.com.au\/blog\/construction-scheduling-software\/#What_is_the_Most_Popular_Scheduling_Software\" >What is the Most Popular Scheduling Software?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-21\" href=\"https:\/\/interscale.com.au\/blog\/construction-scheduling-software\/#What_is_the_Best_Free_Scheduling_Software\" >What is the Best Free Scheduling Software?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-22\" href=\"https:\/\/interscale.com.au\/blog\/construction-scheduling-software\/#Can_AI_Create_a_Construction_Schedule\" >Can AI Create a Construction Schedule?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-23\" href=\"https:\/\/interscale.com.au\/blog\/construction-scheduling-software\/#What_is_the_Most_Popular_Method_for_Scheduling_Construction_Projects\" >What is the Most Popular Method for Scheduling Construction Projects?<\/a><\/li><\/ul><\/li><\/ul><\/nav><\/div>\n\n<p class=\"wp-block-paragraph\">Construction projects don\u2019t fall behind because people aren\u2019t working hard but they fall behind because teams lose track of time, dependencies, and shifting site conditions. That\u2019s where construction planning helps, and reliable scheduling software keeps activity aligned. From budget control to subcontractor coordination, the software helps align your project progress with planned delivery.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">At Interscale, we see many AEC firms looking for powerful tools. They need reliable construction scheduling software that meets the demands of Australia AEC projects. These platforms must scale without overcomplicating delivery. And in the following article below, we will break down some of the top options for you here.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"What_Is_Scheduling_in_Construction\"><\/span>What Is Scheduling in Construction?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Construction scheduling refers to the process of planning, sequencing, and tracking activities across a building project. It ensures stakeholders stay aligned on what happens when, and how changes impact timelines and costs. Several benefits of scheduling software include:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Ensures realistic timelines that adjust as conditions change<\/li>\n\n\n\n<li>Improves subcontractor coordination and sequencing on site<\/li>\n\n\n\n<li>Prevents cost overruns from delays or scope creep<\/li>\n\n\n\n<li>Simplifies inspections, compliance, and handover readiness<\/li>\n\n\n\n<li>Improves communication between site teams, clients, and consultants<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Key_Features_to_Look_For\"><\/span>Key Features to Look For<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The key features to look for in construction scheduling software are those that fit how your team actually works. Many of these features still rely on stable <a href=\"https:\/\/interscale.com.au\/industries\/constructions\/\">IT support for construction firms<\/a>, especially on sites with mixed connectivity or multiple devices in play. Here\u2019s what delivers real value:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Drag-and-drop Gantt or calendar views to update sequences fast<\/li>\n\n\n\n<li>Cloud collaboration for view changes instantly, anywhere<\/li>\n\n\n\n<li>Mobile access for site teams to mark progress on the slab<\/li>\n\n\n\n<li>Progress tracking to compare planned versus actual hours<\/li>\n\n\n\n<li>Integration with drawings \/ BIM \/ estimates to see clashes early<\/li>\n\n\n\n<li>Role-based access to protect sensitive cost codes<\/li>\n\n\n\n<li>Australian standards or local support to align with WHS and ABCB<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"How_to_Set_Up_a_Construction_Schedule\"><\/span>How to Set Up a Construction Schedule?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Setting up a construction schedule starts with defining the project scope and breaking it into manageable phases. The process begins by listing major milestones, then working backward to identify tasks, durations, and dependencies. This creates the backbone of the schedule, which is usually visualised as a Gantt chart or calendar view that shows how activities line up over time.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The next step is assigning responsibilities and linking the schedule to real-world constraints. That includes subcontractor availability, lead times, <a href=\"https:\/\/interscale.com.au\/blog\/construction-document-management-software\/\">construction document management<\/a>, inspection hold points, and client sign-offs. What we\u2019ve seen work best is keeping the schedule live, using software that lets teams update progress, flag delays, and adjust without losing the bigger picture.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Top_Construction_Scheduling_Software\"><\/span>Top Construction Scheduling Software<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Below we\u2019re gonna look at some of Australia\u2019s top construction project scheduling tools. Some work best for residential builds with lots of client touchpoints, while others suit commercial teams juggling BIM, compliance, and site logistics. This list below compares core strengths, typical users, and ballpark pricing to help you spot what fits your setup.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The software pricing shown reflects standard monthly or annual figures available as of July 2025. Actual costs might shift depending on how long you subscribe, what modules you choose, or how you procure the licence. If you need bundled options, software financing, flexible payment plans, the Interscale software licensing team can walk you through it.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"1_Autodesk_Construction_Cloud_Best_for_Collaboration_Control\"><\/span>1. Autodesk Construction Cloud (Best for Collaboration &amp; Control)<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Autodesk Construction Cloud (ACC) unifies scheduling with models, issues, and RFIs. Ideal for designers, builders, and owners sharing <a href=\"https:\/\/interscale.com.au\/blog\/what-is-bim-in-construction\/\">BIM in construction<\/a> in one hub. Works for residential and commercial jobs.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Use case:<\/strong> ACC used by commercial builders and infrastructure contractors needing BIM-linked schedules with tight document control.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Pros of Autodesk Construction Cloud<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>2D\/3D schedule-model linkage<\/li>\n\n\n\n<li>Strong Australian data-hosting option<\/li>\n\n\n\n<li>Flexible monthly licensing via partners<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Cons of Autodesk Construction Cloud<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Learning curve for small crews<\/li>\n\n\n\n<li>Premium price tier<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Pricing of Autodesk Construction Cloud<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Autodesk Construction Cloud pricing is quote-based across all three bundled tiers. The platform is structured into three core modules tailored to project phases. The ACC bundled tiers are Model Management, Preconstruction, and Construction Operations.<\/p>\n\n\n\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link has-white-color has-black-background-color has-text-color has-background has-link-color wp-element-button\" href=\"https:\/\/interscale.com.au\/services\/software-licensing\/autodesk-construction-clouds\/\" target=\"_blank\" rel=\"noreferrer noopener\">ACC License \u2013 Pay Monthly<\/a><\/div>\n<\/div>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"2_Procore_Best_for_Integrated_Project_Platform\"><\/span>2. Procore (Best for Integrated Project Platform)<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Procore offers broad construction project management software with solid scheduling features. It\u2019s often used by commercial and residential builders needing tight coordination. The Scheduling integrates with RFIs, submittals, and mobile reporting.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Use case: <\/strong>Procore commonly adopted by mixed-use and commercial builders coordinating site updates, RFIs, and scheduling across teams.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Pros of Procore<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Deep subcontractor directory<\/li>\n\n\n\n<li>Local data centre in Sydney<\/li>\n\n\n\n<li>Extensive marketplace apps<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Cons of Procore<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Annual contract only<\/li>\n\n\n\n<li>Customisation needs admin time<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Pricing of Procore<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">As of July 2025, Procore pricing is a custom quote. So, you need to contact Procore sales representatives. Alternatively, you can contact the Interscale software licensing team for more reliable pricing in the Australian context.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"3_Buildertrend_Best_for_Residential_Builders\"><\/span>3. Buildertrend (Best for Residential Builders)<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Buildertrend focuses on residential construction and trade-based workflows. It\u2019s ideal for custom home builders, renovation contractors, and subcontractors. The scheduling tool supports drag-and-drop calendars, client updates, and selections tracking.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Use case: <\/strong>Buildertrend preferred by residential builders managing selections, client communication, and subcontractor timelines in one place.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Pros of Buildertrend<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Client selections and approvals<\/li>\n\n\n\n<li>Mobile punch list tools<\/li>\n\n\n\n<li>Competitive residential focus<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Cons of Buildertrend<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Limited complex resource loading<\/li>\n\n\n\n<li>Fewer BIM links<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Pricing of Buildertrend<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Buildertrend pricing is offered on a custom quote basis. Each subscription includes unlimited users, core project tools, and access to the Buildertrend team. This might fit your setup if you&#8217;re looking for a flat-fee model that won\u2019t penalise team growth or integrations down the line.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"4_Microsoft_Project_Best_for_Familiar_Gantt_Work\"><\/span>4. Microsoft Project (Best for Familiar Gantt Work)<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Microsoft Project remains the classic choice for teams needing structured, high-detail scheduling. Please note that Microsoft is retiring \u201cProject for the web\u201d and moving its features into Planner by August 2025. However, the desktop version remains steady for teams that prefer traditional workflows.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Use case:<\/strong> Microsoft Project\/Planner used by schedulers and project managers in firms that require high-precision task mapping without field-based input.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Pros of Microsoft Project\/Planner<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Powerful baseline comparisons<\/li>\n\n\n\n<li>Extensive reporting templates<\/li>\n\n\n\n<li>Wide talent pool of users<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Cons of Microsoft Project\/Planner<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Collaboration add-ons cost extra<\/li>\n\n\n\n<li>No field data capture native<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Pricing of Microsoft Project\/Planner<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">As of July 2025, here is the Microsoft Project\/Planner pricing plan:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Microsoft Planner: Included in Microsoft 365<\/li>\n\n\n\n<li>Planner Plan 1 (formerly Project Plan 1): A$15.00 per user per month, paid yearly<\/li>\n\n\n\n<li>Planner and Project Plan 3 (formerly Project Plan 3): A$44.90 per user per month, paid yearly<\/li>\n\n\n\n<li>Planner and Project Plan 5 (formerly Project Plan 5): A$82.30 per user per month, paid yearly<\/li>\n\n\n\n<li>Project Standard 2024: AU$1,149.00 for one-time purchase<\/li>\n\n\n\n<li>Project Professional 2024: AU$2,299.00 for one-time purchase<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"5_Primavera_P6_Best_for_Mega-Projects\"><\/span>5. Primavera P6 (Best for Mega-Projects)<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Primavera P6 by Oracle is used on large-scale, multi-stakeholder builds. It supports complex scheduling across years, phases, and geographies. Typically used in infrastructure, mining, and rail projects.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Use case: <\/strong>Standard in large-scale transport, mining, and infrastructure projects requiring multi-phase critical path management.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Pros of Primavera P6<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Multiple critical paths<\/li>\n\n\n\n<li>Risk and Monte Carlo add-ins<\/li>\n\n\n\n<li>Mature governance features<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Cons of Primavera P6<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Steep learning curve<\/li>\n\n\n\n<li>High maintenance overhead<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Pricing of Primavera P6<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The pricing of Primavera P6 is usually handled through custom quotes based on how it\u2019s deployed and how many users need access. Oracle doesn\u2019t list fixed prices, but we\u2019ve seen enterprise licences fall between AUD $2,000 and $5,200 per user each year. Final costs often depend on the modules selected and whether the setup is cloud-based or on-prem.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"6_Smartsheet_Best_for_Spreadsheet_Lovers\"><\/span>6. Smartsheet (Best for Spreadsheet Lovers)<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Smartsheet adds project scheduling features to a spreadsheet-style interface. Builders use it for lighter coordination or client-facing views. It\u2019s useful where formal Gantt tools feel too heavy.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Use case: <\/strong>Chosen by client-facing teams needing custom schedule templates or spreadsheet-style task visibility.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Pros of Smartsheet<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Fast template library<\/li>\n\n\n\n<li>Easy conditional alerts<\/li>\n\n\n\n<li>Affordable seat pricing<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Cons of Smartsheet<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Limited heavy scheduling logic<\/li>\n\n\n\n<li>Offline access weak<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Pricing of Smartsheet<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">As of July 2025, the pricing of Smartsheet is:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Pro: A$13 per member\/ per month, billed annualy<\/li>\n\n\n\n<li>Business: A$27 per member\/ per month, billed annualy<\/li>\n\n\n\n<li>Enterprise: Custom pricing<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"7_Jobber_Best_for_trade_service_teams\"><\/span>7. Jobber (Best for trade service teams)<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Jobber supports scheduling and invoicing for smaller teams, especially trades. Electricians, plumbers, and landscapers use it to organise daily jobs. It includes route planning and mobile invoicing.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Use case:<\/strong> Used by trade contractors and maintenance crews managing recurring jobs, site visits, and mobile invoicing.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Pros of Jobber<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Drag-to-assign crew routes<\/li>\n\n\n\n<li>Quoting and payment in one app<\/li>\n\n\n\n<li>Low admin overhead<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Cons of Jobber<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>No Gantt view<\/li>\n\n\n\n<li>Limited multi-project roll-ups<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Pricing of Jobber<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Jobber pricing as of July 2025 is:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Plus: A$575.43 for up to 15 users per month, billed annualy<\/li>\n\n\n\n<li>Grow: A$319.68 for up to 10 users per month, billed annualy<\/li>\n\n\n\n<li>Connect: A$165.93 for up to 5 users per month, billed annualy<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"8_Buildxact_Best_for_Small_Builders_Take-Offs\"><\/span>8. Buildxact (Best for Small Builders &amp; Take-Offs)<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Buildxact blends estimating and scheduling, suited to residential builders. It connects timelines with material orders and cost control. Buildxact&#8217;s focus on the local market means its features and support are well-aligned with how Australian builders work..<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Use case: <\/strong>Ideal for small to mid-sized builders linking estimates, procurement, and schedules for custom residential builds.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Pros of Buildxact<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Local support in Melbourne<\/li>\n\n\n\n<li>Simple quote-to-schedule flow<\/li>\n\n\n\n<li>GST-ready reports<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Cons of Buildxact<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Limited enterprise features<\/li>\n\n\n\n<li>Fewer integrations than rivals<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Pricing of Buildxact<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Buildxact pricing as of July 2025 is:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Foundation: A$2.030 annualy<\/li>\n\n\n\n<li>Pro: A$4.070 annualy<\/li>\n\n\n\n<li>Master: $6.110 annualy<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"9_Fieldwire_Best_for_Site_Coordination\"><\/span>9. Fieldwire (Best for Site Coordination)<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Fieldwire focuses on daily task tracking and crew coordination. Scheduling is task-based, with priority boards and field checklists. While its strength is as a punch list and plan viewing tool, it includes solid task management and scheduling features.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Use case: <\/strong>Deployed by site engineers and foremen needing real-time task coordination and checklist management on tablets.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Pros of Fieldwire<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Fast punch list capture<\/li>\n\n\n\n<li>Blueprint markup tools<\/li>\n\n\n\n<li>Lightweight footprint<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Cons of Fieldwire<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>No deep cost module<\/li>\n\n\n\n<li>Basic reporting only<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Pricing of Fieldwire<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Fieldwire price and plans as of July 2025 is:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Basic: Free<\/li>\n\n\n\n<li>Pro: A$61 per user per month, billed annually<\/li>\n\n\n\n<li>Business: A$92 per user per month, billed annually<\/li>\n\n\n\n<li>Business Plus: A$139 per user per month, billed annually<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"10_Connecteam_Best_for_Workforce_Shifts\"><\/span>10. Connecteam (Best for Workforce Shifts)<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Connecteam supports staff scheduling, time tracking, and mobile comms. It\u2019s not a full construction project scheduler, but useful for labour-heavy teams. Often used in maintenance, fit-out, and services.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Use case: <\/strong>Popular among service teams and fit-out contractors needing daily crew rostering and GPS-based attendance tracking.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Pros of Connecteam<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>GPS time clock<\/li>\n\n\n\n<li>Safety form templates<\/li>\n\n\n\n<li>Affordable per-seat price<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Cons of Connecteam<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Minimal dependency mapping<\/li>\n\n\n\n<li>Limited third-party links<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Pricing of Connecteam<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Connecteam pricing plan as of July 2025 is:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Small Business Plan: Free for life but just up to 10 employees<\/li>\n\n\n\n<li>Basic: A$44.15 per month for the first 30 users, billed annually<\/li>\n\n\n\n<li>Advanced: A$74.59 per month for the first 30 users, billed annually<\/li>\n\n\n\n<li>Expert: A$150.71 per month for the first 30 users, billed annually<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Our_Choice_for_Construction_Scheduling_Platforms\"><\/span>Our Choice for Construction Scheduling Platforms<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">As an IT expert for construction in Australia, our team seen <a href=\"https:\/\/interscale.com.au\/services\/software-licensing\/autodesk-construction-clouds\/\">Autodesk Construction Cloud<\/a> stands out for firms managing complex coordination. It connects the schedule with design models, documentation, and cost tracking in a way that keeps delivery aligned and accountable. This might fit your setup if you\u2019re already using Autodesk tools and need tighter control without jumping between platforms.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The ability to link BIM directly to progress tracking makes a noticeable difference, especially during consultant coordination and issue resolution. It also simplifies document management, which is often where things slip. For firms handling mid to large-scale builds, the clarity ACC brings to scheduling is hard to ignore.<\/p>\n\n\n\n<div class=\"wp-block-group has-background is-layout-constrained wp-container-core-group-is-layout-2a148da8 wp-block-group-is-layout-constrained\" style=\"background-color:#ff9100;margin-top:50px;margin-bottom:50px;padding-top:60px;padding-right:60px;padding-bottom:60px;padding-left:60px\">\n<h2 class=\"wp-block-heading has-black-color has-text-color has-link-color wp-elements-1dcd53894203f78130bd5a78cfae1aa2\"><span class=\"ez-toc-section\" id=\"Flexible_Licensing_for_Construction_Scheduling_Software\"><\/span><strong>Flexible Licensing for Construction Scheduling Software<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Access scheduling software for construction with financing options that fit your budget\u2014no upfront costs.<\/p>\n\n\n\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link has-white-color has-black-background-color has-text-color has-background has-link-color wp-element-button\" href=\"https:\/\/interscale.com.au\/services\/equipment-leasing\/\" target=\"_blank\" rel=\"noreferrer noopener\">Calculate Software Leasing Plan<\/a><\/div>\n<\/div>\n<\/div>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Key_Takeaways\"><\/span>Key Takeaways<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Scheduling supports project momentum by aligning design, delivery, and site activity from day one.<\/li>\n\n\n\n<li>BIM integration, document control, and mobile access now shape how schedules are managed in the field.<\/li>\n\n\n\n<li>If you need help choosing or licensing the right platform, Interscale supports construction teams with flexible procurement and local guidance.<\/li>\n\n\n\n<li>In the end, construction scheduling software is no longer optional because it\u2019s essential to stay on track, on time, and in sync.<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"FAQ\"><\/span>FAQ<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<div class=\"custom-css-block\"><style>#aab_accordion_77610314_0 {  }<\/style><\/div><div class=\"wp-block-aab-accordion-block aab__accordion_container  accessibilityOn\" style=\"margin-top:0px;margin-bottom:15px;border:1px solid #bcb6b638\" id=\"aab_accordion_77610314_0\" role=\"button\" aria-expanded=\"false\" tabindex=\"0\"><div class=\"aab__accordion_head aab_right_icon \" style=\"background-color:#bcb6b638;border-top:none;border-right:none;border-bottom:none;border-left:none\"><div class=\"aab__accordion_heading aab_right_icon aab_right_link\"><div class=\"head_content_wrapper\"><div class=\"title_wrapper\"><h3 class=\"aab__accordion_title\" style=\"margin:0\"><span class=\"ez-toc-section\" id=\"What_is_the_Best_Project_Scheduling_Tool\"><\/span><strong>What is the Best Project Scheduling Tool?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3><\/div><\/div><\/div><div class=\"aab__accordion_icon\" style=\"border:0px solid transparent\"><span class=\"aab__icon dashicons dashicons-plus-alt2\" style=\"font-size:23px\"><\/span><\/div><\/div><div class=\"aab__accordion_body  \" role=\"region\" style=\"display:none;border-top:1px solid #bcb6b638;border-right:none;border-bottom:none;border-left:none\"><div class=\"aab__accordion_component\">\n<p class=\"wp-block-paragraph\">There is no single best project scheduling tool because the proper software depends on your business. For example, a large commercial firm has different needs than a residential builder. The most suitable platform will align with your project complexity, team size, and existing digital ecosystem.<\/p>\n<\/div><\/div><\/div>\n\n\n\n<div class=\"custom-css-block\"><style>#aab_accordion_77610314_0 {  }<\/style><\/div><div class=\"wp-block-aab-accordion-block aab__accordion_container  accessibilityOn\" style=\"margin-top:0px;margin-bottom:15px;border:1px solid #bcb6b638\" id=\"aab_accordion_77610314_0\" role=\"button\" aria-expanded=\"false\" tabindex=\"0\"><div class=\"aab__accordion_head aab_right_icon \" style=\"background-color:#bcb6b638;border-top:none;border-right:none;border-bottom:none;border-left:none\"><div class=\"aab__accordion_heading aab_right_icon aab_right_link\"><div class=\"head_content_wrapper\"><div class=\"title_wrapper\"><h3 class=\"aab__accordion_title\" style=\"margin:0\"><span class=\"ez-toc-section\" id=\"What_is_the_Most_Popular_Scheduling_Software\"><\/span><strong>What is the Most Popular Scheduling Software?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3><\/div><\/div><\/div><div class=\"aab__accordion_icon\" style=\"border:0px solid transparent\"><span class=\"aab__icon dashicons dashicons-plus-alt2\" style=\"font-size:23px\"><\/span><\/div><\/div><div class=\"aab__accordion_body  \" role=\"region\" style=\"display:none;border-top:1px solid #bcb6b638;border-right:none;border-bottom:none;border-left:none\"><div class=\"aab__accordion_component\">\n<p class=\"wp-block-paragraph\">Microsoft Project is still the most popular scheduling software globally, especially in enterprise settings. However, its popularity is declining among SMBs and agile teams, who favor more collaborative and cloud-based tools. What we\u2019ve seen in Australia is that Procore and Buildertrend get picked more often by mid-tier builders who want scheduling baked into broader project workflows.<\/p>\n<\/div><\/div><\/div>\n\n\n\n<div class=\"custom-css-block\"><style>#aab_accordion_77610314_0 {  }<\/style><\/div><div class=\"wp-block-aab-accordion-block aab__accordion_container  accessibilityOn\" style=\"margin-top:0px;margin-bottom:15px;border:1px solid #bcb6b638\" id=\"aab_accordion_77610314_0\" role=\"button\" aria-expanded=\"false\" tabindex=\"0\"><div class=\"aab__accordion_head aab_right_icon \" style=\"background-color:#bcb6b638;border-top:none;border-right:none;border-bottom:none;border-left:none\"><div class=\"aab__accordion_heading aab_right_icon aab_right_link\"><div class=\"head_content_wrapper\"><div class=\"title_wrapper\"><h3 class=\"aab__accordion_title\" style=\"margin:0\"><span class=\"ez-toc-section\" id=\"What_is_the_Best_Free_Scheduling_Software\"><\/span><strong>What is the Best Free Scheduling Software?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3><\/div><\/div><\/div><div class=\"aab__accordion_icon\" style=\"border:0px solid transparent\"><span class=\"aab__icon dashicons dashicons-plus-alt2\" style=\"font-size:23px\"><\/span><\/div><\/div><div class=\"aab__accordion_body  \" role=\"region\" style=\"display:none;border-top:1px solid #bcb6b638;border-right:none;border-bottom:none;border-left:none\"><div class=\"aab__accordion_component\">\n<p class=\"wp-block-paragraph\">The best free scheduling software depends on your team size and needs. Of course, we suggest you start simple and free for first use, so use Asana, Trello, or basic versions of Smartsheet. However, they lack the dedicated features needed for complex construction projects.<\/p>\n<\/div><\/div><\/div>\n\n\n\n<div class=\"custom-css-block\"><style>#aab_accordion_77610314_0 {  }<\/style><\/div><div class=\"wp-block-aab-accordion-block aab__accordion_container  accessibilityOn\" style=\"margin-top:0px;margin-bottom:15px;border:1px solid #bcb6b638\" id=\"aab_accordion_77610314_0\" role=\"button\" aria-expanded=\"false\" tabindex=\"0\"><div class=\"aab__accordion_head aab_right_icon \" style=\"background-color:#bcb6b638;border-top:none;border-right:none;border-bottom:none;border-left:none\"><div class=\"aab__accordion_heading aab_right_icon aab_right_link\"><div class=\"head_content_wrapper\"><div class=\"title_wrapper\"><h3 class=\"aab__accordion_title\" style=\"margin:0\"><span class=\"ez-toc-section\" id=\"Can_AI_Create_a_Construction_Schedule\"><\/span><strong>Can AI Create a Construction Schedule?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3><\/div><\/div><\/div><div class=\"aab__accordion_icon\" style=\"border:0px solid transparent\"><span class=\"aab__icon dashicons dashicons-plus-alt2\" style=\"font-size:23px\"><\/span><\/div><\/div><div class=\"aab__accordion_body  \" role=\"region\" style=\"display:none;border-top:1px solid #bcb6b638;border-right:none;border-bottom:none;border-left:none\"><div class=\"aab__accordion_component\">\n<p class=\"wp-block-paragraph\">AI can draft a baseline from tasks, durations, and common dependencies. It predicts clashes and flags risks from historic patterns. However, human review still validates logic, float, and realistic site constraints.<\/p>\n<\/div><\/div><\/div>\n\n\n\n<div class=\"custom-css-block\"><style>#aab_accordion_77610314_0 {  }<\/style><\/div><div class=\"wp-block-aab-accordion-block aab__accordion_container  accessibilityOn\" style=\"margin-top:0px;margin-bottom:15px;border:1px solid #bcb6b638\" id=\"aab_accordion_77610314_0\" role=\"button\" aria-expanded=\"false\" tabindex=\"0\"><div class=\"aab__accordion_head aab_right_icon \" style=\"background-color:#bcb6b638;border-top:none;border-right:none;border-bottom:none;border-left:none\"><div class=\"aab__accordion_heading aab_right_icon aab_right_link\"><div class=\"head_content_wrapper\"><div class=\"title_wrapper\"><h3 class=\"aab__accordion_title\" style=\"margin:0\"><span class=\"ez-toc-section\" id=\"What_is_the_Most_Popular_Method_for_Scheduling_Construction_Projects\"><\/span><strong>What is the Most Popular Method for Scheduling Construction Projects?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3><\/div><\/div><\/div><div class=\"aab__accordion_icon\" style=\"border:0px solid transparent\"><span class=\"aab__icon dashicons dashicons-plus-alt2\" style=\"font-size:23px\"><\/span><\/div><\/div><div class=\"aab__accordion_body  \" role=\"region\" style=\"display:none;border-top:1px solid #bcb6b638;border-right:none;border-bottom:none;border-left:none\"><div class=\"aab__accordion_component\">\n<p class=\"wp-block-paragraph\">The Critical Path Method (CPM) is the most popular method for scheduling construction projects. Short-cycle teams often combine look-ahead planning with daily huddles. Select methods that match complexity, contract type, and reporting needs.<\/p>\n<\/div><\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Construction projects don\u2019t fall behind because people aren\u2019t working hard but they fall behind because teams lose track of time, dependencies, and shifting site conditions. That\u2019s where construction planning helps, and reliable scheduling software keeps activity aligned. From budget control to subcontractor coordination, the software helps align your project progress with planned delivery. At Interscale, [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":9557,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[883],"tags":[],"class_list":["post-9555","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aec-industry"],"acf":[],"_links":{"self":[{"href":"https:\/\/interscale.com.au\/blog\/wp-json\/wp\/v2\/posts\/9555","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/interscale.com.au\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/interscale.com.au\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/interscale.com.au\/blog\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/interscale.com.au\/blog\/wp-json\/wp\/v2\/comments?post=9555"}],"version-history":[{"count":0,"href":"https:\/\/interscale.com.au\/blog\/wp-json\/wp\/v2\/posts\/9555\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/interscale.com.au\/blog\/wp-json\/wp\/v2\/media\/9557"}],"wp:attachment":[{"href":"https:\/\/interscale.com.au\/blog\/wp-json\/wp\/v2\/media?parent=9555"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/interscale.com.au\/blog\/wp-json\/wp\/v2\/categories?post=9555"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/interscale.com.au\/blog\/wp-json\/wp\/v2\/tags?post=9555"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}