{"id":9579,"date":"2026-04-04T01:26:16","date_gmt":"2026-04-03T14:26:16","guid":{"rendered":"https:\/\/interscale.com.au\/blog\/?p=9579"},"modified":"2026-07-13T18:12:07","modified_gmt":"2026-07-13T08:12:07","slug":"bim-coordination-services","status":"publish","type":"post","link":"https:\/\/interscale.com.au\/blog\/bim-coordination-services\/","title":{"rendered":"Guide to BIM Coordination Services in Australia: Benefits and What\u2019s Included"},"content":{"rendered":"<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_85 ez-toc-wrap-left counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title\" style=\"cursor:inherit\">Table of Contents<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewBox=\"0 0 24 24\" version=\"1.2\" baseProfile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1 eztoc-toggle-hide-by-default' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/interscale.com.au\/blog\/bim-coordination-services\/#Key_Takeaways\" >Key Takeaways<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/interscale.com.au\/blog\/bim-coordination-services\/#Key_Takeaways-2\" >Key Takeaways<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/interscale.com.au\/blog\/bim-coordination-services\/#What_are_BIM_Coordination_Services\" >What are BIM Coordination Services?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/interscale.com.au\/blog\/bim-coordination-services\/#Benefits_of_BIM_Coordination_Services\" >Benefits of BIM Coordination Services<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/interscale.com.au\/blog\/bim-coordination-services\/#Whats_Included_in_BIM_Coordination_Services\" >What\u2019s Included in BIM Coordination Services?<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/interscale.com.au\/blog\/bim-coordination-services\/#1_BIM_Expert_Consultation\" >1. BIM Expert Consultation<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/interscale.com.au\/blog\/bim-coordination-services\/#2_BIM_Coordination_Strategy_Planning\" >2. BIM Coordination Strategy &amp; Planning<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/interscale.com.au\/blog\/bim-coordination-services\/#3_Clash_Detection_Resolution\" >3. Clash Detection &amp; Resolution<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/interscale.com.au\/blog\/bim-coordination-services\/#4_Collaboration_Platform_Setup\" >4. Collaboration Platform Setup<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/interscale.com.au\/blog\/bim-coordination-services\/#5_Team_Workflow_Optimisation\" >5. Team Workflow Optimisation<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-11\" href=\"https:\/\/interscale.com.au\/blog\/bim-coordination-services\/#6_BIM_Model_Development_Standardisation\" >6. BIM Model Development &amp; Standardisation<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-12\" href=\"https:\/\/interscale.com.au\/blog\/bim-coordination-services\/#Types_of_BIM_Coordination_Services\" >Types of BIM Coordination Services<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-13\" href=\"https:\/\/interscale.com.au\/blog\/bim-coordination-services\/#Key_Deliverables_of_BIM_Coordination_Services\" >Key Deliverables of BIM Coordination Services<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-14\" href=\"https:\/\/interscale.com.au\/blog\/bim-coordination-services\/#Projects_that_Require_BIM_Coordination_Services\" >Projects that Require BIM Coordination Services<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-15\" href=\"https:\/\/interscale.com.au\/blog\/bim-coordination-services\/#How_to_Choose_a_BIM_coordination_services_provider\" >How to Choose a BIM coordination services provider<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-16\" href=\"https:\/\/interscale.com.au\/blog\/bim-coordination-services\/#Common_Challenges\" >Common Challenges<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-17\" href=\"https:\/\/interscale.com.au\/blog\/bim-coordination-services\/#Why_Local_BIM_Coordination_Expertise_Matters\" >Why Local BIM Coordination Expertise Matters?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-18\" href=\"https:\/\/interscale.com.au\/blog\/bim-coordination-services\/#How_Interscale_Delivers_BIM_Coordination_in_Australia\" >How Interscale Delivers BIM Coordination in Australia?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-19\" href=\"https:\/\/interscale.com.au\/blog\/bim-coordination-services\/#Streamline_Your_Projects_with_Expert_BIM_Coordination\" >Streamline Your Projects with Expert BIM Coordination<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-20\" href=\"https:\/\/interscale.com.au\/blog\/bim-coordination-services\/#FAQ\" >FAQ<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-21\" href=\"https:\/\/interscale.com.au\/blog\/bim-coordination-services\/#What_is_BIM_Coordination\" >What is BIM Coordination?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-22\" href=\"https:\/\/interscale.com.au\/blog\/bim-coordination-services\/#What_is_the_Difference_Between_BIM_Modelling_and_BIM_Coordination\" >What is the Difference Between BIM Modelling and BIM Coordination?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-23\" href=\"https:\/\/interscale.com.au\/blog\/bim-coordination-services\/#What_Software_is_Used_for_BIM_Coordination\" >What Software is Used for BIM Coordination?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-24\" href=\"https:\/\/interscale.com.au\/blog\/bim-coordination-services\/#What_is_MEP_BIM_Coordination\" >What is MEP BIM Coordination?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-25\" href=\"https:\/\/interscale.com.au\/blog\/bim-coordination-services\/#Why_is_HVAC_Coordination_Important_in_BIM\" >Why is HVAC Coordination Important in BIM?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-26\" href=\"https:\/\/interscale.com.au\/blog\/bim-coordination-services\/#How_Much_do_BIM_Coordination_Services_Cost\" >How Much do BIM Coordination Services Cost?<\/a><\/li><\/ul><\/li><\/ul><\/nav><\/div>\n\n<aside class=\"wp-block-group has-cyan-bluish-gray-background-color has-background is-layout-constrained wp-container-core-group-is-layout-823f331c wp-block-group-is-layout-constrained\" style=\"margin-top:0px;margin-bottom:50px;padding-top:40px;padding-right:40px;padding-bottom:40px;padding-left:40px\">\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Key_Takeaways\"><\/span>Key Takeaways<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li>BIM coordination covers strategy, documentation, and model alignment across disciplines, not just clash detection.<\/li>\n\n\n\n<li>Poor coordination turns clash reports into a box-ticking exercise, leaving release decisions to drift from the reviewed model.<\/li>\n\n\n\n<li>Australian BIM coordination typically costs A$40 to A$100 per hour, varying by project size, complexity, and LOD.<\/li>\n\n\n\n<li>Revit, MEP, HVAC, and 3D federation coordination each address different project risks and should not be treated as interchangeable.<\/li>\n<\/ul>\n<\/aside>\n\n\n\n<p class=\"wp-block-paragraph\">Coordination issues in BIM are both disruptive and costly. One missed clash or an out-of-sync model can delay critical timelines, escalate expenses, and strain relationships across the project team. That\u2019s why the value of BIM coordination services becomes obvious as soon as workflows start to buckle under pressure.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This is often overlooked when clash detection is reduced to a box-ticking exercise rather than approached as a strategic coordination process. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">At Interscale, we\u2019ve seen firsthand how well-defined planning, consistent Revit workflows, and standardised documentation can prevent most of these issues before they surface. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In this article, we\u2019ll discuss what BIM coordination services actually involve.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Key_Takeaways-2\"><\/span>Key Takeaways<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li>BIM coordination services matter when models look aligned but release decisions start drifting.<\/li>\n\n\n\n<li>The real value of BIM coordination services is issuing drawings from a model the team still trusts.&nbsp;<\/li>\n\n\n\n<li>Different BIM coordination types solve different risks; 3D stabilises federation, MEP handles dense services, HVAC controls spatial drivers, and Revit coordination prevents documentation drift.<\/li>\n\n\n\n<li>A strong BIM coordination services provider delivers release confidence, not just clash reports.<\/li>\n\n\n\n<li>In Australia, BIM coordination services typically cost between A$40 to A$100 per hour depending on project size, complexity, and required Level of Development (LOD).&nbsp;<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"What_are_BIM_Coordination_Services\"><\/span>What are BIM Coordination Services?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">BIM coordination services are the structured processes and tools used to manage, align, and maintain multidisciplinary models across design and construction phases. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">These services go beyond clash detection; they include strategy planning, team workflows, documentation protocols, and ongoing model updates. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A BIM coordinator doesn\u2019t just \u201ccheck for errors\u201d but they ensure consultants align on standards, timelines, and deliverables using platforms like Autodesk Construction Cloud and tools embedded within Revit.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">It\u2019s a discipline that links architectural, structural, MEP, and civil inputs into a unified, clash-free, and buildable model. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For project managers and digital delivery leads, BIM coordination services reduce rework, clarify communication, and simplify stakeholder sign-off. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">When done right, it becomes the backbone of a project\u2019s digital twin strategy, driving quality and compliance throughout the lifecycle.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Benefits_of_BIM_Coordination_Services\"><\/span>Benefits of BIM Coordination Services<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The main benefit of BIM coordination services is earlier control over design conflict before it turns into rework, package delay, or site confusion. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The list below shows where that control improves release confidence, reduces coordination friction, and keeps issued information closer to the model actually reviewed:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Reduces rework by catching model conflict before it spreads into procurement, fabrication, or construction activity.<\/li>\n\n\n\n<li>Improves release confidence when teams issue packages against a review set they still trust.<\/li>\n\n\n\n<li>Shortens revision loops by reducing arguments over whether a clash is current or already resolved.<\/li>\n\n\n\n<li>Clarifies issue ownership so open items can be assigned, escalated, and closed without duplication.<\/li>\n\n\n\n<li>Strengthens approval confidence by tying decisions back to the model state actually reviewed.<\/li>\n\n\n\n<li>Lowers commercial risk when outdated model information is less likely to move into downstream packages.<\/li>\n\n\n\n<li>Improves buildability review by highlighting conflicts affecting access, penetrations, sequencing, and service fit.<\/li>\n\n\n\n<li>Helps project leads separate modelling noise from issues that now threaten cost or timing.<\/li>\n\n\n\n<li>Supports mixed software environments by bringing order across tools, versions, and approval habits.<\/li>\n\n\n\n<li>Gives BIM in construction a stronger starting point because issued information stays closer to the coordinated model.<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Whats_Included_in_BIM_Coordination_Services\"><\/span>What\u2019s Included in BIM Coordination Services?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A <a href=\"https:\/\/interscale.com.au\/services\/bim-services\/\">comprehensive BIM service<\/a> tackles the entire coordination process, from initial strategy to final model handover. It begins with consultation and planning, continues through collaborative setup and model alignment, and extends to maintaining consistent documentation across stakeholders. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Below are the core service inclusions.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"1_BIM_Expert_Consultation\"><\/span>1. BIM Expert Consultation<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The first step is always clarification. BIM coordinators meet with architects, engineers, and project managers to understand project scope, design intent, and coordination needs. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This discovery phase helps identify risk areas, such as late model handovers or scope overlap, and sets the tone for proactive issue prevention.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">From there, coordinators advise on the right coordination tools, level of development (LOD) strategy, and shared parameter frameworks. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For teams working in Revit, this often includes reviewing existing templates, worksets, and collaboration protocols. The outcome is a clearer path forward for everyone involved.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"2_BIM_Coordination_Strategy_Planning\"><\/span>2. BIM Coordination Strategy &amp; Planning<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Typically, we define how the coordination will be executed, from the meeting cadence to model handover protocols. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This includes identifying who owns what models, when updates are expected, and how data will flow across teams. A strong coordination plan prevents confusion and limits downstream disputes.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"3_Clash_Detection_Resolution\"><\/span>3. Clash Detection &amp; Resolution<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">This is the most visible part of coordination, but it follows a defined system. Coordinators use tools like Navisworks, Revizto, or BIM Track to run clash tests based on agreed matrices. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">They categorise issues, assign ownership, track resolutions, and validate fixes to turn clash reports into structured, trackable actions instead of static lists.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"4_Collaboration_Platform_Setup\"><\/span>4. Collaboration Platform Setup<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Seamless data exchange starts with a well-configured environment. Coordinators set up and manage the central BIM collaboration platform, typically using Autodesk Construction Cloud, BIM 360, or similar tools. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The setup includes:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Defining project workspaces and folder structures<\/li>\n\n\n\n<li>Assigning user roles and permission levels<\/li>\n\n\n\n<li>Establishing upload\/download workflows for model coordination<\/li>\n\n\n\n<li>Integrating issue tracking tools to consolidate communication.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">This foundation keeps teams aligned, reduces versioning errors, and ensures consistent access across disciplines. Tools like ACC\u2019s Issues and Meetings modules are also integrated to centralise communication. The goal is simple: reduce email chains and consolidate design decisions in one traceable place.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"5_Team_Workflow_Optimisation\"><\/span>5. Team Workflow Optimisation<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Workflow optimisation in BIM coordination involves structuring how teams communicate around live model data. Coordination meetings are planned in sync with model drop cycles, using set agendas tied to clash tracking and status validation. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Tools like Navisworks or Revizto provide the clash intelligence needed to drive these sessions with clarity.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Meeting outputs, issue logs, and RFIs are documented using Autodesk Construction Cloud\u2019s integrated tools, not siloed spreadsheets. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Each issue is tracked with deadlines, assigned responsibilities, and current resolution states to avoid ambiguity. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Coordinators also manage versioned meeting minutes, stored centrally for consistency and auditability.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Beyond meetings, coordinators build documentation frameworks that align with ISO 19650-2 delivery cycles. This includes federation registers, model progression logs, and structured reporting aligned to project gates. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Summary dashboards highlight unresolved issues by trade or zone, helping teams focus coordination effort where it counts most.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"6_BIM_Model_Development_Standardisation\"><\/span>6. BIM Model Development &amp; Standardisation<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Model consistency plays a critical role in coordination, especially across multiple firms. BIM coordinators assess or develop Revit templates, shared parameters, and standardised families to align modelling outputs. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This process reduces friction between disciplines and keeps federated models technically coherent.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Key areas include LOD structure, nested family behaviour, naming rules, and file management settings. Coordinators also address file sizes, reference management, and category mapping to avoid system clashes. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">When standards are unified early, teams work faster and models integrate cleanly at every drop stage.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Types_of_BIM_Coordination_Services\"><\/span><strong>Types of BIM Coordination Services<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Project risk does not form in the same place, which is why BIM coordination services typically fall into four types: 3D BIM coordination, MEP BIM coordination, HVAC BIM coordination, and Revit BIM coordination. The table below compares how each type addresses a different BIM coordination pressure.<\/p>\n\n\n\n<figure class=\"wp-block-table is-style-stripes has-small-font-size\"><table class=\"has-fixed-layout\"><thead><tr><th>Type<\/th><th>Focus<\/th><th>Risk Controlled First<\/th><th>Best Fit<\/th><\/tr><\/thead><tbody><tr><td><strong>3D BIM coordination services<\/strong><\/td><td>Multi-discipline model federation and review<\/td><td>Spatial clashes, stale federations, model alignment drift<\/td><td>Commercial buildings, multi-consultant projects<\/td><\/tr><tr><td><strong>MEP BIM coordination<\/strong><\/td><td>Services routing, penetrations, plant space coordination<\/td><td>Congested service zones, buildability conflicts, routing rework<\/td><td>Hospitals, labs, dense services environments<\/td><\/tr><tr><td><strong>HVAC BIM coordination<\/strong><\/td><td>Ductwork layout, plant positioning, ceiling clearance and access<\/td><td>Clearance failure, maintenance access risk, ceiling coordination pressure<\/td><td>Mechanically dense projects<\/td><\/tr><tr><td><strong>Revit BIM coordination services<\/strong><\/td><td>Linked-model control, shared coordinates, publish discipline<\/td><td>Model-state drift, documentation inconsistency, version misalignment<\/td><td>Revit-led consultant teams<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Key_Deliverables_of_BIM_Coordination_Services\"><\/span><strong>Key Deliverables of BIM Coordination Services<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The key deliverables of BIM coordination services should show control over model alignment, not just coordination activity. The list below outlines the outputs that help your teams track issue ownership, maintain federation reliability, and issue packages with clearer release confidence.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>A current federated model that reflects the latest architecture, structure, and services inputs.<\/li>\n\n\n\n<li>A structured issue register with ownership, status, and traceable close-out decisions.<\/li>\n\n\n\n<li>Filtered clash review outputs that prioritise buildability and release-impact conflicts.<\/li>\n\n\n\n<li>Coordination meeting records tied to viewpoints and model-based issue references.<\/li>\n\n\n\n<li>Publish and revision tracking to highlight outdated consultant models or misaligned updates.<\/li>\n\n\n\n<li>Responsibility mapping that clarifies which discipline resolves each coordination item.<\/li>\n\n\n\n<li>Escalation notes identifying unresolved conflicts that may affect package issue timing.<\/li>\n\n\n\n<li>Version-controlled coordination snapshots to support release decisions and approvals.<\/li>\n\n\n\n<li>Model review viewpoints that communicate spatial conflicts across disciplines clearly.<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Projects_that_Require_BIM_Coordination_Services\"><\/span><strong>Projects that Require BIM Coordination Services<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Projects that require BIM coordination services are usually those where design conflicts can quickly spread into procurement, sequencing, or installation risk, which you can see in the list below:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Hospitals need deeper coordination because dense MEP systems, medical planning, and plant zones compete for limited space.<\/li>\n\n\n\n<li>Commercial buildings need stronger alignment where ceilings, risers, fa\u00e7ade interfaces, and tenant fitouts intersect.<\/li>\n\n\n\n<li>Industrial facilities demand coordination that respects equipment envelopes, maintenance access, and staged installation logic.<\/li>\n\n\n\n<li>Infrastructure projects require cleaner discipline alignment between civil, structural, services, and asset information outputs.<\/li>\n\n\n\n<li>Large mixed-use developments need coordination across multiple building zones, staging plans, and consultant packages.<\/li>\n\n\n\n<li>Laboratories and research facilities rely on tighter services routing due to specialised equipment and ventilation demands.<\/li>\n\n\n\n<li>Data centres require careful coordination around cooling systems, cable containment, and plant redundancy layouts.<\/li>\n\n\n\n<li>High-density residential towers benefit from coordination where repetitive floor plates still contain complex service stacking.<\/li>\n\n\n\n<li>Transport hubs need coordinated interfaces between structure, services, architectural flow, and operational clearances.<\/li>\n\n\n\n<li>Smaller projects may still require coordination when consultant inputs are fragmented or programme timelines are compressed..<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"How_to_Choose_a_BIM_coordination_services_provider\"><\/span>How to Choose a BIM coordination services provider<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">To get the best-fit, buyers should test whether the BIM coordination services provider can keep model currency, issue ownership, and approval timing tied together when delivery pressure rises.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The questions below can help you test the provider whether coordination support delivers real control or just produces clash reports.<\/p>\n\n\n\n<figure class=\"wp-block-table is-style-stripes has-small-font-size\"><table class=\"has-fixed-layout\"><thead><tr><th>Question<\/th><th>Strong Answer<\/th><th>Warning Sign<\/th><\/tr><\/thead><tbody><tr><td>Are coordination reviews run on the latest models?<\/td><td>Federated model shows discipline versions and publish dates<\/td><td>Models combined without checking timestamps or updates<\/td><\/tr><tr><td>How are coordination issues tracked and closed?<\/td><td>Issues assigned to discipline owners with due dates and close-out confirmation<\/td><td>Long issue lists without ownership or closure tracking<\/td><\/tr><tr><td>How are clashes prioritised?<\/td><td>Clashes grouped and filtered by buildability and release impact<\/td><td>Raw clash exports shared without filtering<\/td><\/tr><tr><td>How is model currency maintained between meetings?<\/td><td>Outdated links flagged before review and replaced in federation<\/td><td>Coordination continues using stale consultant models<\/td><\/tr><tr><td>How is responsibility defined between disciplines?<\/td><td>Routing zones, penetrations, and shared areas assigned clearly<\/td><td>Multiple disciplines resolving the same clash without ownership<\/td><\/tr><tr><td>Does the coordination workflow fit mixed software environments?<\/td><td>Works across Revit, Navisworks, ACC, PDFs, and email approvals<\/td><td>Assumes one coordination platform solves everything<\/td><\/tr><tr><td>How does coordination connect to package release?<\/td><td>Outputs identify areas safe to issue and areas still on hold<\/td><td>Reports produced without release-readiness guidance<\/td><\/tr><tr><td>How is documentation aligned with coordinated models?<\/td><td>Sheets and schedules checked against coordinated model state<\/td><td>Drawings issued while coordination still ongoing<\/td><\/tr><tr><td>What happens when coordination risks remain?<\/td><td>Release-risk clashes escalated before deadlines<\/td><td>All clashes treated equally without prioritisation<\/td><\/tr><tr><td>What does the coordination deliver to project leads?<\/td><td>Clear summary of model readiness and remaining risks<\/td><td>Technical reports without decision support<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Common_Challenges\"><\/span>Common Challenges<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Common challenges in BIM coordination usually appear when model timing, issue ownership, and release decisions fall out of sync. Let\u2019s break them down:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Timing drift mixes current and outdated discipline models inside the same federation.<\/li>\n\n\n\n<li>Release authority is unclear between design leads, BIM coordination, and project management.<\/li>\n\n\n\n<li>Model currency breaks when coordination continues on stale consultant links.<\/li>\n\n\n\n<li>Issue registers grow while unresolved items still move into documentation.<\/li>\n\n\n\n<li>Mixed software workflows fragment coordination across Revit, Navisworks, ACC, and PDFs.<\/li>\n\n\n\n<li>Clash overload hides buildability risks inside large unfiltered clash sets.<\/li>\n\n\n\n<li>Publish cycles do not align with package release timing.<\/li>\n\n\n\n<li>Responsibility overlap leaves shared conflicts without a clear owner.<\/li>\n\n\n\n<li>Documentation updates from partially coordinated model states.<\/li>\n\n\n\n<li>Coordination exists without clear release control.<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Why_Local_BIM_Coordination_Expertise_Matters\"><\/span>Why Local BIM Coordination Expertise Matters?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">BIM coordination is not just a technical task, and contextual. Local expertise influences how effectively your team meets project standards, client protocols, and regulatory requirements. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For Australian AEC projects, the following factors make local coordination support especially valuable:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Aligns with Australian BIM mandates, client standards, and ISO 19650 implementation<\/li>\n\n\n\n<li>Provides timezone-aligned meetings with fast response during business hours<\/li>\n\n\n\n<li>Local knowledge of government, healthcare, and commercial building requirements<\/li>\n\n\n\n<li>Reduces coordination risk through use of contextual Revit templates and content<\/li>\n\n\n\n<li>Supports common project tools (ACC, Revizto, BIMcollab) with Australian settings<\/li>\n\n\n\n<li>Speaks the same language, literally and culturally, with project stakeholders<\/li>\n\n\n\n<li>Enables model reviews and walkthroughs in real-time with onshore consultants<\/li>\n\n\n\n<li>Anticipates regulatory documentation needs early (e.g. BIM Execution Plan, Model Audit)<\/li>\n\n\n\n<li>Smooth handovers across project stages, from design through construction<\/li>\n\n\n\n<li>Ongoing support for mid-project changes or site coordination issues<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"How_Interscale_Delivers_BIM_Coordination_in_Australia\"><\/span>How Interscale Delivers BIM Coordination in Australia?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Interscale provides <a href=\"https:\/\/interscale.com.au\/services\/bim-services\/\">BIM management services<\/a> to help AEC firms restore model-state control, publish discipline, and coordination clarity when delivery pressure increases.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Our focus on tightening how models are published, how issues are owned, and which model state decisions actually apply to. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This kind of approach matters when coordination appears active yet release confidence keeps dropping.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Rather than producing more reports, our support centres on stabilising federation currency, aligning consultant publish timing, and clarifying who decides when an area is safe to issue. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">That shift turns coordination from ongoing discussion into a controlled step before documentation moves forward.<\/p>\n\n\n\n<div class=\"wp-block-group has-background is-layout-constrained wp-container-core-group-is-layout-2a148da8 wp-block-group-is-layout-constrained\" style=\"background-color:#ff9100;margin-top:50px;margin-bottom:50px;padding-top:60px;padding-right:60px;padding-bottom:60px;padding-left:60px\">\n<h2 class=\"wp-block-heading has-black-color has-text-color has-link-color wp-elements-bd3aba54ea00da373d3f9131ee0a064d\"><span class=\"ez-toc-section\" id=\"Streamline_Your_Projects_with_Expert_BIM_Coordination\"><\/span>Streamline Your Projects with Expert BIM Coordination<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Ensure accuracy, reduce clashes, and improve collaboration with professional BIM coordination services.<\/p>\n\n\n\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link has-white-color has-black-background-color has-text-color has-background has-link-color wp-element-button\" href=\"https:\/\/interscale.com.au\/services\/bim-services\/bim-coordination\/\" target=\"_blank\" rel=\"noreferrer noopener\">Request BIM Coordination<\/a><\/div>\n<\/div>\n<\/div>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"FAQ\"><\/span>FAQ<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<div class=\"wp-block-aab-accordion-block aab__accordion_container  accessibilityOn\" style=\"margin-top:0px;margin-bottom:15px;border:1px solid #bcb6b638\" id=\"aab_accordion_d33357bd_0\" role=\"button\" aria-expanded=\"false\" tabindex=\"0\"><div class=\"aab__accordion_head aab_right_icon \" style=\"background-color:#bcb6b638;border-top:none;border-right:none;border-bottom:none;border-left:none\"><div class=\"aab__accordion_heading aab_right_icon aab_right_link\"><div class=\"head_content_wrapper\"><div class=\"title_wrapper\"><h3 class=\"aab__accordion_title\" style=\"margin:0\"><span class=\"ez-toc-section\" id=\"What_is_BIM_Coordination\"><\/span><strong>What is BIM Coordination?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3><\/div><\/div><\/div><div class=\"aab__accordion_icon\" style=\"border:0px solid transparent\"><span class=\"aab__icon dashicons dashicons-plus-alt2\" style=\"font-size:23px\"><\/span><\/div><\/div><div class=\"aab__accordion_body  \" role=\"region\" style=\"display:none;border-top:1px solid #bcb6b638;border-right:none;border-bottom:none;border-left:none\"><div class=\"aab__accordion_component\">\n<p class=\"wp-block-paragraph\">BIM coordination is the process of aligning multiple discipline models so conflicts can be identified, assigned, reviewed, and resolved before release or construction. It turns separate model work into a controlled project record.<\/p>\n<\/div><\/div><\/div>\n\n\n\n<div class=\"wp-block-aab-accordion-block aab__accordion_container  accessibilityOn\" style=\"margin-top:0px;margin-bottom:15px;border:1px solid #bcb6b638\" id=\"aab_accordion_d33357bd_0\" role=\"button\" aria-expanded=\"false\" tabindex=\"0\"><div class=\"aab__accordion_head aab_right_icon \" style=\"background-color:#bcb6b638;border-top:none;border-right:none;border-bottom:none;border-left:none\"><div class=\"aab__accordion_heading aab_right_icon aab_right_link\"><div class=\"head_content_wrapper\"><div class=\"title_wrapper\"><h3 class=\"aab__accordion_title\" style=\"margin:0\"><span class=\"ez-toc-section\" id=\"What_is_the_Difference_Between_BIM_Modelling_and_BIM_Coordination\"><\/span><strong>What is the Difference Between BIM Modelling and BIM Coordination?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3><\/div><\/div><\/div><div class=\"aab__accordion_icon\" style=\"border:0px solid transparent\"><span class=\"aab__icon dashicons dashicons-plus-alt2\" style=\"font-size:23px\"><\/span><\/div><\/div><div class=\"aab__accordion_body  \" role=\"region\" style=\"display:none;border-top:1px solid #bcb6b638;border-right:none;border-bottom:none;border-left:none\"><div class=\"aab__accordion_component\">\n<p class=\"wp-block-paragraph\">BIM modelling is the creation of discipline-specific model content, while BIM coordination is the review and control process that checks how those models interact and whether they are ready to support issue and release decisions.<\/p>\n<\/div><\/div><\/div>\n\n\n\n<div class=\"wp-block-aab-accordion-block aab__accordion_container  accessibilityOn\" style=\"margin-top:0px;margin-bottom:15px;border:1px solid #bcb6b638\" id=\"aab_accordion_d33357bd_0\" role=\"button\" aria-expanded=\"false\" tabindex=\"0\"><div class=\"aab__accordion_head aab_right_icon \" style=\"background-color:#bcb6b638;border-top:none;border-right:none;border-bottom:none;border-left:none\"><div class=\"aab__accordion_heading aab_right_icon aab_right_link\"><div class=\"head_content_wrapper\"><div class=\"title_wrapper\"><h3 class=\"aab__accordion_title\" style=\"margin:0\"><span class=\"ez-toc-section\" id=\"What_Software_is_Used_for_BIM_Coordination\"><\/span><strong>What Software is Used for BIM Coordination?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3><\/div><\/div><\/div><div class=\"aab__accordion_icon\" style=\"border:0px solid transparent\"><span class=\"aab__icon dashicons dashicons-plus-alt2\" style=\"font-size:23px\"><\/span><\/div><\/div><div class=\"aab__accordion_body  \" role=\"region\" style=\"display:none;border-top:1px solid #bcb6b638;border-right:none;border-bottom:none;border-left:none\"><div class=\"aab__accordion_component\">\n<p class=\"wp-block-paragraph\">Revit, Navisworks, Autodesk Construction Cloud, Solibri, Revizto, and BIMcollab are several common software that use in Australia BIM coordination delivery. <\/p>\n<\/div><\/div><\/div>\n\n\n\n<div class=\"wp-block-aab-accordion-block aab__accordion_container  accessibilityOn\" style=\"margin-top:0px;margin-bottom:15px;border:1px solid #bcb6b638\" id=\"aab_accordion_d33357bd_0\" role=\"button\" aria-expanded=\"false\" tabindex=\"0\"><div class=\"aab__accordion_head aab_right_icon \" style=\"background-color:#bcb6b638;border-top:none;border-right:none;border-bottom:none;border-left:none\"><div class=\"aab__accordion_heading aab_right_icon aab_right_link\"><div class=\"head_content_wrapper\"><div class=\"title_wrapper\"><h3 class=\"aab__accordion_title\" style=\"margin:0\"><span class=\"ez-toc-section\" id=\"What_is_MEP_BIM_Coordination\"><\/span><strong>What is MEP BIM Coordination?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3><\/div><\/div><\/div><div class=\"aab__accordion_icon\" style=\"border:0px solid transparent\"><span class=\"aab__icon dashicons dashicons-plus-alt2\" style=\"font-size:23px\"><\/span><\/div><\/div><div class=\"aab__accordion_body  \" role=\"region\" style=\"display:none;border-top:1px solid #bcb6b638;border-right:none;border-bottom:none;border-left:none\"><div class=\"aab__accordion_component\">\n<p class=\"wp-block-paragraph\">MEP BIM coordination is the review of mechanical, electrical, plumbing, fire, and hydraulic systems so routing, penetrations, plant zones, and access requirements work together in the same project environment.<\/p>\n<\/div><\/div><\/div>\n\n\n\n<div class=\"wp-block-aab-accordion-block aab__accordion_container  accessibilityOn\" style=\"margin-top:0px;margin-bottom:15px;border:1px solid #bcb6b638\" id=\"aab_accordion_d33357bd_0\" role=\"button\" aria-expanded=\"false\" tabindex=\"0\"><div class=\"aab__accordion_head aab_right_icon \" style=\"background-color:#bcb6b638;border-top:none;border-right:none;border-bottom:none;border-left:none\"><div class=\"aab__accordion_heading aab_right_icon aab_right_link\"><div class=\"head_content_wrapper\"><div class=\"title_wrapper\"><h3 class=\"aab__accordion_title\" style=\"margin:0\"><span class=\"ez-toc-section\" id=\"Why_is_HVAC_Coordination_Important_in_BIM\"><\/span><strong>Why is HVAC Coordination Important in BIM?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3><\/div><\/div><\/div><div class=\"aab__accordion_icon\" style=\"border:0px solid transparent\"><span class=\"aab__icon dashicons dashicons-plus-alt2\" style=\"font-size:23px\"><\/span><\/div><\/div><div class=\"aab__accordion_body  \" role=\"region\" style=\"display:none;border-top:1px solid #bcb6b638;border-right:none;border-bottom:none;border-left:none\"><div class=\"aab__accordion_component\">\n<p class=\"wp-block-paragraph\">HVAC coordination is important in BIM because ductwork and plants often take the most space and force other systems to respond around them. If that review is weak, the downstream cost can appear in rerouting, access conflicts, ceiling redesign, and site rework.<\/p>\n<\/div><\/div><\/div>\n\n\n\n<div class=\"wp-block-aab-accordion-block aab__accordion_container  accessibilityOn\" style=\"margin-top:0px;margin-bottom:15px;border:1px solid #bcb6b638\" id=\"aab_accordion_d33357bd_0\" role=\"button\" aria-expanded=\"false\" tabindex=\"0\"><div class=\"aab__accordion_head aab_right_icon \" style=\"background-color:#bcb6b638;border-top:none;border-right:none;border-bottom:none;border-left:none\"><div class=\"aab__accordion_heading aab_right_icon aab_right_link\"><div class=\"head_content_wrapper\"><div class=\"title_wrapper\"><h3 class=\"aab__accordion_title\" style=\"margin:0\"><span class=\"ez-toc-section\" id=\"How_Much_do_BIM_Coordination_Services_Cost\"><\/span><strong>How Much do BIM Coordination Services Cost?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3><\/div><\/div><\/div><div class=\"aab__accordion_icon\" style=\"border:0px solid transparent\"><span class=\"aab__icon dashicons dashicons-plus-alt2\" style=\"font-size:23px\"><\/span><\/div><\/div><div class=\"aab__accordion_body  \" role=\"region\" style=\"display:none;border-top:1px solid #bcb6b638;border-right:none;border-bottom:none;border-left:none\"><div class=\"aab__accordion_component\">\n<p class=\"wp-block-paragraph\">In Australia, BIM coordination services typically cost between A$40 to A$100 per hour or A$5,000\u2013$85,000 per project, depending on project size, complexity, and required Level of Development (LOD). Large-scale infrastructure or hospital projects can exceed A$100,000 due to compliance and risk management requirements.<\/p>\n<\/div><\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Key Takeaways Coordination issues in BIM are both disruptive and costly. One missed clash or an out-of-sync model can delay critical timelines, escalate expenses, and strain relationships across the project team. That\u2019s why the value of BIM coordination services becomes obvious as soon as workflows start to buckle under pressure. This is often overlooked when [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":12931,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[871],"tags":[],"class_list":["post-9579","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-bim"],"acf":[],"_links":{"self":[{"href":"https:\/\/interscale.com.au\/blog\/wp-json\/wp\/v2\/posts\/9579","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/interscale.com.au\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/interscale.com.au\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/interscale.com.au\/blog\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/interscale.com.au\/blog\/wp-json\/wp\/v2\/comments?post=9579"}],"version-history":[{"count":3,"href":"https:\/\/interscale.com.au\/blog\/wp-json\/wp\/v2\/posts\/9579\/revisions"}],"predecessor-version":[{"id":12881,"href":"https:\/\/interscale.com.au\/blog\/wp-json\/wp\/v2\/posts\/9579\/revisions\/12881"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/interscale.com.au\/blog\/wp-json\/wp\/v2\/media\/12931"}],"wp:attachment":[{"href":"https:\/\/interscale.com.au\/blog\/wp-json\/wp\/v2\/media?parent=9579"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/interscale.com.au\/blog\/wp-json\/wp\/v2\/categories?post=9579"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/interscale.com.au\/blog\/wp-json\/wp\/v2\/tags?post=9579"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}